TURNKEY INSTALLATIONS
-
DESIGN & FABRICATE
It takes 4 months to design and manufacture your water simulation tank. Tanks are purchasable as equipment and are only installed indoors.
-
DELIVER & INSTALL
Installation takes 6 weeks to complete and over 10,000 nuts and bolts. Tanks can be disassembled, moved, reassembled and used again if needed.
-
FILL & TEST
Tanks are filled, tested, drained, and tested again before being rubber-coated internally, to ensure all leaks are gone, and your equipment is watertight.
FTCC, CUMBERLAND COUNTY, NORTH CAROLINA - SWIFTWATER TRAINING CENTER (AUDIO)
ORDERING PROCESS
-
Once you have an idea of the tank you are interested in, request a quote from us and we will send you an estimate of cost. Everything will be included and the resulting solution is turnkey.
-
After we receive your quote request our staff will generate an estimate based on your selections, tax rate, and any applicable discounts. If everything looks good then you issue us a PO.
-
Purchase orders can by issued by email or via postal service. Please reference the estimate number on your purchase order. When we receive your PO we will issue you an invoice.
-
After we receive your purchase order we will send you an invoice spelling out all equipment requests, shipping, and taxes.
-
Before executing payment, we will exchange floor plans, spec sheets, warranty, and installation schedule. We will also provide our Certificate of Insurance.
-
All payments are to be wired directly, due to the size of the payments associated with large equipment purchasing. Wire information can be obtained from your invoice. Please reference the invoice number with your wire payment.
-
After payment is received we will contact you immediately to schedule meetings for design and site visits. The entire process from payment to using the tank is approximately six (6) months.