OUR PROCESS
OUR TURNKEY process WILL HAVE YOUR TANK READY TO USE IN LESS THAN 6 MONTHS.
Fathom Tank Installation is Fast and Reliable.
DESIGN 2-3 DAYS
- We work with your team to design a water simulation tank that suits your requirements.
- You receive a CAD drawing of your tank and all parts before fabrication begins.
- We can assist your site developers with architectural renderings for permitting.
1
2
FABRICATION 12 WEEKS
- Tanks are constructed of bolted-metal sheets.
- Fabrication takes 1-3 months depending on the complexity.
- Completed tanks arrive ready to assemble at your location.
ASSEMBLY4-6 WEEKS
- Fathom’s team will arrive to assemble your simulation tank.
- Tanks are filled, tested for leaks, drained and tested again.
- Lastly, tanks are coated with a 3mm layer of leak sealant.
3
4
STAGING1-2 DAYS
- Simulation tanks and all equipment are ready to use immediately.
- Heating water takes 1-4 days to complete, depending on depth.
- Training props are installed and secured.
USE FOR TRAINING & RESEARCH
Tanks can be used to offer endless types of training, such as: swiftwater and flood rescue training, scuba diving and surface supplied air diving, university or collegiate testing, aerospace training, and more.
5
USE FOR MEDIA PRODUCTION
Tanks can be used to simulate various water locations and underwater environments for media production. Simulate dangerous water situations in a safe, controllable location.